top of page

​Logistics

Pin by Sol on Wallpaper _ Black and white photo wall, Black aesthetic wallpaper, Black and

​Props & Costumes

Character.png
d3f9d7bbd882ed9524aad8800acb015a.jpg

​Location Release

Screenshot 2024-03-31 at 00.01.35.png

Actor Release

Actor Release

Screenshot 2024-03-31 at 00.01.21.png

​Call Sheet

​Call Sheet

Production Team

05b2a4683fbf182019dc3b11757b4a64-2.jpg

Floor Plan

These are two floor plans that I draw to display the arrangement of our equipments and actor while filming in the studio and at the alley

e5e040fa0ac8fa9bf9bab164b3b290eb.jpg

*Slide for more

Shooting
Schedule

This is the shooting schedule in January and February of our group. At the end of January, we planned to have the first shooting day on the 20th of January if possible. However, if we don’t make it on time in terms of preparation, the contingency day is on the 27th of January which is 1 week later because we have schools on week days therefore everything would have to be on the weekends. The second filming and photoshoot will be on the 28th of January. Both the first and second day will be studio day as we want every shot using the studio to be finished in just two days. The third filming day that is outdoor will be on the 3rd of February and its contingency day is on the 4th of February. 

89da20778c44cd09a398256c60980843.jpg

Equipment Required

FACEBOOK (4).png

Copyright  Considerations

My group decided to contact Kali Uchis for the copyright licence via email as we think that it’s the most direct way to get in touch with her. We emailed via our production company email (renee.entertainment23@gmail.com) on 11th of January 2024 to make it as professional as possible. Even though we didn’t receive a confirmation letter from her, at least we already tried to reach the owner to fulfil the obligation. 

Screenshot 2024-01-19 at 00.09.56.png

RISK ASSESSMENT

bottom of page